Event tree node and relationship types

Every node type and relationship type an event tree recognises, what to write for each, how each is drawn, how splits are ordered, and what may follow what.

Node types

Node typeWrite it asDrawn under CustomRule
Initiating eventInitiating Event, Initiating, Init, StartOrange ellipseStarts the tree. Exactly one per tree, and nothing leads to it.
Pivotal eventPivotal Event, Pivotal, Function, Functional Event, Safety Function, Safety System, Mitigating System, Mitigating Factor, Protection Function, System Function, HeadingBlue rectangleA function that works or fails. Needs at least two branches out.
Branch pointBranch Point, Branch, DecisionPurple diamondA split drawn as a point rather than a box. The same rules as a pivotal event.
Success outcomeSuccess Outcome, Success, YesGreen rounded rectangleEnds a sequence. Nothing follows it.
Failure outcomeFailure Outcome, Failure, NoRed rounded rectangleEnds a sequence. Nothing follows it.
ConsequenceConsequence, End State, OutcomePink parallelogramEnds a sequence. Nothing follows it.

Under IEC 62502:2010 every node is a plain rectangle, with a heavier border on the initiating event and on consequences, and a branch point is a small filled dot with its label beneath it.

Matching ignores case, spaces, underscores, hyphens and full stops, so Pivotal_Event, pivotal event and PivotalEvent all read as a pivotal event. Wording that matches nothing can be mapped under Node type values on the Data Mapping tab.

Relationship types

Relationship typeWrite it asUse it forIn a sequence identifierConnector under Custom
Success branchSuccess Branch, Success, Yes, TrueThe branch taken when the function works.SGreen arrow
Failure branchFailure Branch, Failure, No, FalseThe branch taken when it fails.FRed arrow
Conditional branchConditional Branch, Conditional, OtherA further branch at a split, such as partial success.CPurple dashed arrow
SequenceSequence, NextA step that is the only way on from a node. The default for a blank cell.NothingGrey arrow

Under IEC 62502:2010 every connector is a plain line without an arrowhead, and a conditional branch is dashed. Unrecognised wording can be mapped under Relationship values on the Data Mapping tab.

How the branches of a split are ordered

At every split, success branches come first, then Next, then conditional, then failure. Left to right, that puts success above failure; top to bottom, success is on the left. Order only decides between branches of the same kind, and two branches of the same kind with the same Order are reported.

What may follow what

NodeBefore itAfter it
Initiating eventNothing.One node, usually the first pivotal event, with Relationship Type Next.
Pivotal event or branch pointOne node.Two or more branches. One branch is a warning; none is an error.
Success outcome, failure outcome or consequenceOne node.Nothing.